Selected work  /  Case 01 · J&J Master Data Management Senior Design Consultant at Zenda
Johnson & Johnson

A modernization of how a global finance organization governs its master data.

Enterprise Transformation Pharma Service Design Operating Model
Details

Human-centered design, made load-bearing inside a Fortune 50 finance transformation.

Johnson & Johnson's global finance organization runs on dozens of master data domains. GL accounts, cost centers, profit centers, products, vendors, trading partners. They flow through every close, plan, forecast, and reporting cycle across four operating sectors: Pharmaceutical, Consumer, Medical Devices, and Vision. Over time, the request-and-approval processes behind those domains had grown fragmented, slow, and error-prone. The friction landed in the most sensitive moments of the fiscal calendar.

Zenda was engaged to lead the human-centered design and future-state operating-model design strands of J&J's Finance Systems & Technology modernization. As Senior Design Consultant, I led the HCD research and operating-model design for the Master Data Management workstream. A six-month engagement that became the foundation for J&J's MDM modernization roadmap.

5
International sites
Jacksonville · Manila · Titusville · Prague · UK
200+
Stakeholders synthesized
Enterprise + Sector tracks, one Conceptual Design
30–50%
Submission error rate
Incorrect requests at point of entry
5/30
Fields requesters could complete unaided
The form was not the bottleneck. It was the receipt.
4
Operating sectors covered
Pharmaceutical · Consumer · Medical Devices · Vision

Goals

What the engagement was set up to deliver, framed as outcomes rather than activities.
  • Surface the actual operational reality of the master-data request process across the global finance footprint.
  • Quantify the human and operational cost of the current state in terms the executive committee could act on.
  • Design a future-state operating model that solved for immediate operational relief and long-term modernization.
  • Make the human-centered design layer load-bearing inside the transformation roadmap, not post-hoc change management.
  • Synthesize input across four operating sectors into a single Conceptual Design ready for CFO-level review.
  • Stand up a quick-wins set that delivered relief before any platform decision.

Approach

Contextual inquiry across five international sites. Enterprise and Sector workshops reaching 200+ finance stakeholders. The findings reframed the problem.

The HCD research was structured as contextual-inquiry field work across five international J&J sites, paired with Enterprise and Sector workshops that reached more than 200 finance stakeholders. Three sites were visited on-site. Two were researched virtually.

Jacksonville, Florida. Global Vision Care MDM team, on-site.

Manila, Philippines. Southeast Asia and North America Pharmaceutical, Medical and Consumer MDM team, on-site.

Titusville, New Jersey. Pharmaceutical MDM, on-site.

Prague, Czech Republic. EMEA Medical and Pharmaceutical MDM team, virtual.

United Kingdom. EMEA Systems and Reporting team, virtual.

Field work was paired with Enterprise- and Sector-level workshops, interviews, and document review across all four operating sectors.

Current-state operating model diagram showing master-data request flows across all five international J&J MDM team sites, with parallel submission channels and unowned handoffs between teams.
Figure 1 · Current-state operating model Produced during the engagement, showing master-data request flows across all five international J&J MDM teams. The diagram made the fragmentation visible at executive level for the first time.

The research surfaced a consistent pattern across every site, every domain, and every team. The numbers came out of contextual inquiry, not survey work. They were what the teams were already living.

30–50%
Submission error rate
Master-data requests submitted incorrectly at point of entry, across every site and every domain.
5/30
Fields requesters could complete unaided
The remaining 25 fields required MDM-team assistance, every time.
~30%
North American rejection rate
Rejected and returned to sender, then re-submitted, often through a different channel entirely.

Five or more parallel submission channels coexisted. Formal form. Email. Attached spreadsheet. Photocopy. Screenshot. No shared workflow. No single source of truth for what a request was, where it lived, or who owned it next.

And in Manila, a single local mapper had already developed an informal IDoc Report workaround that was achieving a 70% error reduction inside her own team. A fix that the surrounding system was actively preventing from generalizing.

"The problem the client had framed as a technology problem was, on the evidence, an operating-model problem. The form was the receipt at the end of a process no one owned end-to-end."
Reframing the brief — MDM workstream, month two

The convergence

What changed structurally between current state and future state, rendered as a single shape.
Insight
Five international sites, five parallel submission channels, no shared owner. The future-state model converged all five into one governed workflow, with the Manila workaround promoted from local fix to global pattern.
From five parallel submission channels to one governed workflow Five labeled international site nodes on the left, each connected by curved paths through a central convergence point, exiting on the right as a single bold blue line into a single unified workflow node. CURRENT STATE CONVERGENCE FUTURE STATE Jacksonville / Vision Care MDM Manila / SEA & NA Pharma MDM Titusville / Pharma MDM Prague / EMEA Medical & Pharma United Kingdom / EMEA Systems & Reporting 5 PARALLEL CHANNELS Manila IDoc workaround promoted local → global RACI · SMART-FORM · ONE QUEUE 1 WORKFLOW RACI‑GOVERNED 1 OWNER · 1 PATH · 0 BLACK BOXES 30–50% submission errors ~30% NA rejection 70% error reduction (Manila pilot) 5 → 1 channel
Figure 2 · Custom diagram Source: J&J FS&T MDM Conceptual Design, 2020

Solution

Two interlocking layers. A smart-form UX that absorbed error at source, and a distributed operating model that named ownership end-to-end.

The future-state design worked across two interlocking layers. A smart-form UX and a distributed operating model. Both were synthesized into a single Conceptual Design Document and a quick-wins-to-future-state roadmap.

01 · Smart-form UX

The request form was redesigned to do work the previous form had never done. Auto-populate fields from upstream systems. Validate at field-level rather than at submission. Surface ambiguity before it reached an approver. The form, as a designed artifact, could absorb a significant share of the request-error rate by preventing bad data from leaving the field.

Smart-form decision tree diagram showing the redesigned request logic with field-level validation gates, branching paths for different request types, and a single consolidated submission channel at the bottom.
Figure 3 · Smart-form decision tree Departmental-spend request flow. Field-level validation, branching logic, and the consolidated submission path that absorbed the request-error rate at source.
02 · Distributed RACI

The five parallel submission channels were consolidated into one. Global and local responsibilities were named explicitly. The Manila mapper's informal IDoc workaround was promoted from a local fix to a global pattern. The black box of the approval queue was opened. Every requester had visibility into where their request sat and what was happening to it next.

03 · Stakeholder synthesis

The future-state model was anchored in input from more than 200 finance colleagues across J&J's Enterprise and Sector tracks. Captured in workshops, interviews, and contextual-inquiry sessions. The Conceptual Design Document framed the modernization approach for the broader Finance Systems & Technology transformation and went into CFO-level designee review.

04 · Quick-wins roadmap

Alongside the future state, the work produced a set of immediately actionable changes the organization could deploy without waiting for the platform decision. Operational pressure relieved inside the first quarter, before any technology procurement.

Finance MDM Future-State Model. A single integrated diagram combining the consolidated workflow, smart-form UX, distributed RACI, and approval visibility into one operating-model artifact.
Figure 4 · Finance MDM Future-State Model The consolidated workflow, smart-form UX, and distributed RACI rendered as a single integrated operating-model artifact. The document framed the modernization approach for the broader transformation roadmap.
"The Manila mapper had built a 70% error fix inside her own team. The surrounding system was preventing it from generalizing. The future-state model promoted her work from local fix to global pattern."
On the distributed RACI · Solution layer two

Outcomes

What shipped, what stuck, and what the engagement set up for the platform work that followed.
Operating model
5 → 1
A unified governance model that consolidated five parallel submission channels into a single, RACI-governed workflow.
Source: Conceptual Design Document
Transformation foundation
CFO‑level review
A Conceptual Design Document that became the HCD foundation of J&J's MDM modernization roadmap.
Source: FS&T modernization scope
Research depth
200+
Finance stakeholders synthesized across Enterprise and Sector tracks into one integrated artifact. The human layer was structurally embedded, not bolted on.
Source: Engagement scope, 2020
Quick wins
Q1 relief
A quick-wins set that delivered operational relief inside the first quarter of the engagement, before any technology procurement.
Source: Quick-wins roadmap deliverable

Talk to Ben about your work

If the surface isn't holding, the operating model usually isn't either.

That's the work. Naming what the org chart, the queue, and the form are quietly doing to the experience, and designing the thing that actually fixes it.